The only planes based on Kauai were five small plans operated by a flying school and two owned by private owners. The project also included strengthening of the runway pavement to support heavier aircraft loads and construction of new emergency roads to give crash fire vehicles improved access and a training exercise fire fit. A ground breaking ceremony was held on March 6, 1981 for the new north-south 6,500-foot by 150 foot runway. A contract was awarded on June 23, 1952 for alterations to the Terminal Building to Tharp-Fitzsimmons for $74,500. Official opening day ceremonies were planned for January 8, 1950. Air conditioning was installed in the ticket and waiting lobbies on May 22, 1974. A vast improvement was afforded to the crash fire rescue capabilities of the airport; 6,000 square feet of space under roof with room for four crash fire vehicles. and Returning for Direct Airport Release and the5 Day Or Less Program . Lanai Airport (LNY) (808) 241-3902 Statewide Badging Fees (Effective July 27, 2015) New Badge Fees: No Fingerprinting Required $10 Fingerprinting Required $60 Badge Renewals Before Expiration Date: BADGES MAY BE RENEWED UP TO 60 DAYS PRIOR TO THE EXPIRATION DATE No Criminal History Record Check Required $10 Criminal History Record Check Required $40 for 1st badge $10 after 1st, [] A three-bay storage facility and an extension was made to the airport maintenance baseyard in October 2003. In mid-2001 Ahukini Road was realigned to provide additional lease lots for airport tenants. Cost: $27,330. do NOT contact us with unsolicited services or offers post id: 7594291172 BADGES MAY BE RENEWED UP TO 60 DAYS PRIOR TO THE EXPIRATION DATE No Criminal History Record Check Required $10 Criminal History Record Check Required $40 for 1st badge $10 after 1st, with valid fingerprint No Badge Renewals After Expiration Date NEW APPLICATION PROCESS REQUIRED UPON BADGE EXPIRATION Same as NEW BADGE FEES (Above) Planning for the new runway was 90 percent compete by mid-1979. The FAA also published a Notice of Proposed rule-Making on Aviation Security and began to implement an airport security system. The Territorial Department of Public Works determined that Barking Sands Field was too far from the center of the population (34 miles from Lihue) and that mixing military and civilian flying had not proven successful at any point. Badge Office Location and hours Location: Arrivals level of Main Terminal across from baggage claim #7. Governors Executive Order No. Act 299, SLH 1990, appropriated $39.5 million for design and construction of airport facilities; and $14.8 million for design and construction of an extension to the existing runway. Ground Transportation Drivers. Under this program, every airport serving air carriers certified by the Civil Aeronautics Board was required to maintain certificates from the FAA to remain in operation. Cost: $46,990. Act 328, SLH 1997, appropriated $30 million for design and construction of an extension to Runway 17-35; $7.9 million for design and construction of a new Traffic Control Tower; $1.4 million for design and construction of a connector road to Lihue Post Office; $350,000 for design of a new cargo building adjacent to the commuter terminal; $11.8 million for construction of a general aviation subdivision and Ahukini Road realignment; $2.5 million for construction of heliport hangars and office space; $550,000 for design for a general aviation apron; and $1.5 million for land acquisition. The following are general examples of what Media may not be used for or in connection with. A project for new covered walkways and a baggage claim counter was completed on April 12, 1956. Lihue is home to Kauai's only commercial airport. Lihue airport security line wait times; Filing a claim for lost or damaged items; TSA jobs and employment; TSA Offices near Lihue . The HDOT held public meetings in 1991 to discuss construction of an inland heliport to decrease helicopter noise complaints. Canada 3000 began direct flights from Vancouver to LIH on December 5, 1995 using a Boeing 757 aircraft, capable of bringing in 226 Canadian tourists daily. As soon as Inikis winds abated, airport personnel went to work cleaning up the facilities so they could be used as quickly as possible. The airport was opened to non-scheduled air carrier and air freight operators from this date, pending completion of radio and terminal facilities necessary for the operation of scheduled air carriers. This program imposed an entirely new system of inspections, record-keeping and reporting on airports and required additional funds and personnel to meet its stringent requirements. Lacking cargo terminal space, the airport recommended the construction of a cargo terminal at the site recommended by the Master Plan. Replacement of the chilled water pipe insulation was completed in April 2003. Twenty covered auto parking stalls were completed and rented for $4 per month effective March 1, 1951. You cannot schedule a training class or another Badging Office Appointment until you have dropped off your signed application and your signatory has informed you that you are now able to test. Name Lihue Hawaii TSA Address 4280 Rice Street, a Lihue, Hawaii, 96766 Phone 808-241-7766. . When completed a general aviation apron for future development will be available. Lihue Airport completed its first year of operation on January 8, 1951. Upon completion of a rotating beacon and obstruction lights on Kalepa and Carters Point, night schedules were started on April 4, 1950. Cost: $3,000. Until the new helicopter terminal is completed, the existing helipads were the subject of careful scrutiny by the FAA and declared satisfactory based on revised layout and operating procedures. Cost: $48,754. Heliport improvements were completed in October 2007. Cost: $440,000. The Richard A. Kawakami Terminal, named in honor of the late Speaker of the Hawaii House of Representatives, was dedicated at Lihue Airport on December 2, 1988. Molokai Airport (MKK) The CAA approved the exchange. See our locations here. (808) 961-9350, Monday Friday (Except State Holidays) Act 281, SLH 2000, appropriated $200,000 for construction of a three bay storage facility at maintenance baseyard; $1.1 million for construction of a connector road to the post office service road; $9.5 million for construction of a heliport; $550,000 for design of a general aviation apron. Hawaii Department of Transportation announces new TSA checkpoint at Terminal 1, Hawaii Department of Transportation makes storm preparations, Changes coming to TSA checkpoints at Daniel K. Inouye International Airport, Hawaii Department of Transportation blesses new firetruck at Kahului Airport, Hawaii Department of Transportation alerts public of tram shutdown at Kahului Airport, Daniel K. Inouye International Airport Pass & ID Office. Main Terminal This location does not accept cash or checks. The new runway was designed for aircraft approaches over water, thereby reducing noise levels in urban areas and providing safer flight operations with the installation of an instrument landing system by the FAA. The location of baggage claiming facilities was designed for maximum convenience to the airlines in expediting their turn-around time, but proved unsatisfactory to the public by requiring them to carry their luggage through a crowded lobby to the street. Act 300, SLH 1992, appropriated $5.76 million for construction of airport complex facilities. Electrical power was out for several days. 1950 dated May 5, 1961 set aside 2.759 acres for an addition to Parcel D at Lihue Airport. A new storm drainage system, landscaping, irrigation system, new access roads and fencing were also included in the project. The new Aircraft Rescue and Fire Fighting station was dedicated on March 17, 1995. For most Kauai residents the trip to the airport required as much time as the air trip to Honolulu. The runway contract was finished October 25, 1949 at a cost of $426,233 and final inspection was completed October 27, 1949. Act 259, SLH 2001, appropriated $1.5 million for construction of a three bay facility and improvements to existing maintenance shop building; $1 million for design and construction of additional employee parking facilities; $450,000 for design and construction of improvements to baggage facilities to accommodate wide-body aircraft; and $13.8 million for construction of a general aviation apron. In addition, the concessionaire was required to pay a percentage of his annual gross receipts to the Airports Division. The site is within 30 minutes drive for more than half to the population of Kauai and it is believed that within a few years personal flying on Kauai will be a considerable activity. The facilities were completed in June 1990. 2600 dated January 26, 1972 set aside three parcels of land totaling 26.9255 acres for an addition to Lihue Airport. The security section consisted of four patrolmen of the State Airports Division since the County of Kauai was unable to assign policemen to the airport. 3500 dated September 1, 1982 set aside 2.798 acres at Ninini Point for an addition to Lihue Airport. Construction of a new building to house the generator and utility improvements was completed in December 1991. 1880 dated August 20, 1959 added 344.353 acres of land to Lihue Airport for aviation purposes. Construction began in February 1990 on a new 30,000 cargo building and 4,000 square foot Commuter Terminal, including aprons and taxiways for the two facilities. Barking Sands was to be retained by the Army and there appeared to be no reasonable possibility of obtaining from the Army adequate civil operating privileges in the field. Any use, whether or not commercial, that may tend to degrade, tarnish the reputation of, or embarrass the content creator (photographer, videographer etc. As soon as the winds died down, airport staff worked through the night to clear the runways at Lihue Airport so that emergency aircraft could land at first light to assist in the recovery effort. Recommendations in the master plan for improvements included: extension of Runway 17-35 to 8,500 feet to adequately accommodate the landing and takeoff of non-stop wide body aircraft to the Mainland; a terminal area expansion including extension of the aircraft parking apron, passenger terminal concourse and the construction of four new connecting taxiways; an additional cargo building; new Aircraft Rescue and Fire Fighting Station; and a new National Weather Service facility. Kalaupapa Airport (LUP) Act 300, SLH 1985, appropriated $8 million to construct airport facilities including, buildings, roads, parking, utilities, aircraft aprons, taxiways, runways, cargo terminal, lease lots, and hangars.. Construction of a new ground transportation subdivision began in July 1985. Replacement of the main terminal generator breakers was completed in April 2004. Non-scheduled operators averaged approximately 18 round trips from Honolulu per month. Cost: $137,000. Barking Sands Airport (USAAF), which the Army made available for commercial flights though World War II, was the temporary Kauai terminal of Hawaiian Airlines Ltd. which had 158 scheduled flights per month (79 round trips from Honolulu). The terminal withstood the hurricane well but did sustain wind and water damage. Ground breaking ceremonies were held October 28, 1948 and actual construction began November 4, 1948. Kapalua Airport (JHM) A contract for grading and paving a 3,750-foot runway was let in 1948 for $359,627. The project was expected to be completed in 1987. The perimeter road and fence were upgraded. A contract was awarded for miscellaneous improvements on September 27, 1974. Prior to introduction of Convair 340 airplanes by Hawaiian Airlines, it was necessary to lengthen the runway and taxiways from 3,750 feet to 5,100 feet. PHL's Badging Office, located in the Airport Communications Center between Terminals C and D on Departures Road, is open Monday-Friday from 9 a.m.-9 p.m. Items left on the aircraft, please contact . Completed August 1985. Reserve a Hertz car rental at Lihue Airport. The site was estimated to cost $112,500 for a minimum of 250 acres at $450 per acre. Port Allen Airport, which was not suitable for large airport operation, was served by non-scheduled operators who average approximately 196 round trips per month from Honolulu. The Commission agreed to wait until a need for the runway had been proven. Cost: $80,000. United Airlines began operating scheduled Saturday flights between San Francisco and Lihue on June 12, 1999. Cost: $39,252. The airport worked with TSA and other agencies to minimize inconvenience to the travelling public. 3259 dated August 11, 1984 set aside 5.663 acres of land for an addition to Lihue Airport. The public address system was upgraded in September 2009. It now runs parallel with Runway 3-21 and meets current FAA dimensional and pavement design standards. A new fire station was dedicated on September 22, 1978. Cost: $5,615. Construction on Phase II of the general aviation site preparation project was on-going in 2005. The airport would have potential value during a national emergency. New loading bridges were installed in September 2005. Grooving of the runway was completed in May 1976. Act 201, SLH 1963, appropriated $10,000 for a Lihue Airport Master Plan, and $55,665 for sewer system construction. Alterations and additions to the terminal building including a new covered walkway, baggage counter and drainage were completed on June 21, 1955. Badging office hours are as follows: Monday - Friday. The HAC decided to start work on a permanent terminal building at Lihue, rather than a temporary one. The alteration and expansion of the terminal building and the enlargement of the auto parking area were completed in 1959. In addition, medium intensity landing lights were installed on the extended portions of the runway. Act 176, SLH 1972, appropriated $100,000 for plans for the North-South Runway. Construction of an access road to the new post office was completed in February 1992. Architectural barriers were removed in July 2005. Runway 3-21 was resurfaced on August 16, 1967. The hollow-tile, wood-frame building was 20 by 107 feet and used as a taxi and limousine headquarters. Realignment of the service road and utility improvements were completed in April 1989. Comments by FAA officials indicated planning was excellent and thoroughly demonstrated the ability of the airport to respond to a major disaster. These projects were completed and the airport was ready for scheduled night flights by April 1, 1950, a temporary runway lighting system having already been installed prior to opening day. Address and Phone Number for Lihue Hawaii TSA, a TSA Office, at Rice Street, Lihue HI. The 30 acres included Parcels A, B. Improvements to the new terminal were completed in November 1990. You are required to expressly accept the following Terms and Conditions of Use, without any modifications, prior to each use of this website. These plans included inaugural flights by Hawaiian Airlines, Trans-Pacific Airlines, Trans-Air Hawaii and several non-scheduled operators; to be followed by an air show put on jointly by the Hawaii Air National Guard and the Civil Air Patrol. Port Allen was planned and developed as the principal Kauai airport before the years of the development of the DC-3 or comparable planes. The increasing number of hotels on Kauai made it an attractive tourist destination and the there was a 25 percent increase in operations in 1973. ), the State of Hawaii, or HDOTA is strictly prohibited. A Jeep crash fire truck was put into operation at Lihue Airport in January 1951. The terminal provided accommodations for fixed-wing general aviation, air taxi and tour aircraft operations. Construction of a light plane taxiway and realignment of the entrance road, resurfacing of the taxiway and a slurry sealing of the apron began on June 24, 1965. Cost: $5,187. Kalaeloa Airport (JRF) Act 216, SLH 1987, appropriated $5.8 million for construction of facilities in the airport complex, and $1.4 million for airfield improvements. In October 1958, a parking lot was added to the existing terminal area and a restaurant building connected to the terminal was completed in March 1959. Signs and graphics for the new terminal were installed in October 1986. Cost: $5.5 million. An interim helicopter facility was being used to serve helicopter operations until the inland heliport is built. The Badge Office is the designated security credentialing authority for LAX and Van Nuys airports. Copyright 2023, State of Hawaii. This office effectively manages access control in restricted areas by operating a public service counter for all employees working at LAX and Van Nuys airports that require a security badge or terminal identification card. Hurricane Iniki, with 160 mph winds, moved directly over Kauai on September 11, 1992, inflicting wide-spread damage at Lihue Airport. A major obstacle was finding an alternate system for disposal of mill waste water which was discharged into the fields to be acquired for the new runway and terminal building. An environmental impact statement got underway in 1992. Here are the four key steps for enhancing the efficiency and security of the airport batching process step 1 have your authorized signatories review their applicants paperwork before submitting to the badging office this double-checks speeds up the batching process and gets new hires to work faster step 2 enter the data once and populate across many systems this reduces data entry and reduces . Three sites were considered for the proposed Class IV airport, which was required to have two runways, graded 5,200 feet long and 500 feet wide, and paved 5,000 feet long and 200 feet wide, with all necessary fencing, lighting, drainage and other useful ground development, as well as a small temporary office building. Office hours to review the SIDA Security video and complete the associated test are from 8am - 2:30pm, Monday through Friday. Work was completed on an extension of Runway 3-21 from 5,100 feet to 6,000 feet in length on March 2, 1970. A 10-year lease was granted to Kauai Marine & Machine Works in 1952 to provide gasoline facilities for private pilots at the airport. A new security system was installed in September 1994. Act 200, SLH 2003, appropriated $9 million for construction of a heliport; and $2.5 million for baggage claim improvements. Act 300, SLH 1980, appropriated $8.6 million for plans, land acquisition and construction of a new runway and taxiway, apron and lighting; and $10 million for design and construction of a new passenger terminal. You agree that, upon notice from HDOTA, you will immediately cease all use of the Media and, to the extent possible, remove all Media from any and all materials in which they appear. The Kauai Police Department requested that the HAC pay for police protection at Lihue Airport on November 27, 1950. On March 7, 1949 the HAC received a letter from Hawaiian Airlines outlining the absolute need for a second runway at Lihue, in view of CAA and CAB restrictions for scheduled airline operations. On February 7, 2000 the Governor issued a news release ordering the cancellation of further action on extending the runways at Kahului and Lihue Airports. A contract for airfield shoulder stabilization began in August 1985. A bronze bust of Kawakami was unveiled and a tile mural by Kauai artist David Kuraoka, which was located in the lobby of the terminal, was also dedicated during the ceremony. You, your successors and assigns, agree to release, indemnify and defend HDOTA and the State of Hawaii from and against all costs, liability, loss, damage, and expense, including all attorneys fees, and all claims, suits, and demands therefor, arising out of or resulting from your acts or omissions under these Terms & Conditions of Use and your use of the Media. Credit must be placed adjacent to any use of the Media. Items lost in the terminal building, parking lots, or shuttle, visit our Lost and Found page and complete the form. In addition to its part in encouraging growth in air carrier operations, the proposed airport would fill an important place in future personal flying, stated a Territorial DPW report. The following list is not exhaustive. Visitors to Kauai declined 14 percent following the hurricane. The State of Hawaii Department of Transportation Airport Division (the HDOTA) may revise the Terms and Conditions of Use without any specific notice to you. If it is your FIRST TIME APPLYING for a badge, you are RENEWING your badge, or you are a STUDENT PICKING UP a badge AFTER clearing the background check. Cost: $2 million. On July 24, 1950 the HAC authorized an extension of the Lihue runway a minimum distance of 750 feet, and as much length as possible be added to the northeast end, the balance to the added to the southwest end. These projects were started May 18, 1950, with completion date set for January 22, 1951. The new $36 million passenger terminal was dedicated on February 25, 1987 and became operational the next day, serving the three interisland carriers, and United Airlines. Also constructed was an Interim Helicopter Facility. Please read the following Terms & Conditions of Use carefully before using this website. Sixty-four arrival and departure flight information display screens were located throughout the terminal. Cost: $5.42 million. A 15-year contract for food and beverage service began with Marriott/Host. Port Allen Airport (PAK) Construction began on Taxiways J and H and the aircraft parking apron on June 18, 1984. The water system for the airport represented an expenditure of $55,564. Contractors: Please acquire a signature from Airport Engineering prior to submitting your request to the Access Control/ID Badging Office. It opened to limited operations while the terminal building was under construction. For after hours and weekend badging issues. Governors Executive Order No. Governors Executive Order No. The runway extension was completed in October 1952 at a cost of $178,697. Visitors consistently give the facility high marks for its ease of navigation, cleanliness, friendly staff, laid-back yet professional atmosphere, and partially open-air design. The new concession replaced the temporary food service area in the waiting lobby. Cost: $616,076. Cost: $4.6 million. By Act 153 Session Laws 1945, the Legislature appropriated $115,000 for the Lihue project. Work to extend Runway 3-21 to 6,500 feet and widen it to 150 feet started in May 1990. Cost: $550,904. The large north wing space was provided for the Civil Aeronautics Administration offices, communication operations room, maintenance room and the United States Weather Bureau. Hawaiis airports passed inspection in every important respect, and corrective measures were initiated to correct some minor instances of non-compliance, such as lack of adequate clear zones. Guidelines and restrictions Lihue Airport (LIH) allows vehicle pickup/drop-off at the Turo-dedicated parking area at Kukui Grove Center, which is accessib. Act 91, SLH 1999, appropriated $200,000 for construction of a three-bay storage facility at maintenance baseyard. Act 1, Special Session 1, 1981, appropriated $13.65 million for a new passenger terminal complex. United Airlines restarted daily nonstop flights to Lihue, Kauai on June 10, 1998 after halting service after Hurricane Iniki. With a wide selection of economy, luxury, and SUV rentals, check out current rental rates today and explore Kauai rental cars. Act 285, SLH 1984, appropriated $26 million to construct airport facilities including, buildings, roads, parking, utilities, aircraft aprons, taxiways, runways, cargo terminal, lease lots, and hangars. An expanded roadway system, parking lot and utility systems, and new maintenance baseyard were completed in 1987. Cost: $6.2 million. A project to upgrade the passenger terminal and build additional auto park areas was being planned in 1956. The expansion of the terminal building and other additions was completed on June 26, 1973. Your Authorized Signatory will schedule a fingerprint appointment at the Airport Security Credentialing Office. Customer service applicants and other walk-ins are also dealt with throughout the day. The central lobby featured a gift shop, flower shop, newsstand, restaurant, snack bar and beverage facility. Completed July 5, 1963. Act 264, SLH 1982, appropriated $21.65 million for design and construction of a new terminal complex. One traveler went so far as to declare it his 'all-time favorite' airport! Cost: $1.18 million. Hawaii airports were impacted greatly with a decrease in flights and passengers. Fencing was installed at Lihue Airport in 1974 to meet new FAA security requirements. Hardest hit was Kauai where the airport received extensive damage. Only for Dogs and Cats Located in Hawaii that are Departing and Requesting Direct Airport Release at Kona, Kahului and Lihue Airports on Return. 15 minutes. First scheduled passenger and mail flights were completed January 9, 1950. Governors Executive Order No. Now you are able to print, download, or share the form. The vehicle could transport the fire chief, break-in tools and fire suppressant chemicals to a crash within three to four minutes, while slower equipment was still on the way. LIH is located about 1.5 miles east of the town of Lihue, along Kauai's southeast coast. Congress passed the Aviation and Transportation Security Act on November 19, 2001 which established the Transportation Security Administration (TSA). This may be the most traveled town on Kauai since it is home to Kauai 's main airport (the Lhue Airport) and Nwiliwili Harbor, the island's major commercial shipping center and cruise ship port. On September 1, 1949, the airport was inspected and accepted by the CAA and the HAC. To make a fingerprinting or ID badge appointment, call 215-937-5452. A contract was awarded for the reroofing of the terminal building on January 24, 1966. The terrorist attacks on the United States on September 11, 2001 resulted in the Federal Aviation Administration shutting down all U.S. airports for three days. Transportation Network Companies (TNC) Pickup Zones, Daniel K. Inouye International Airport (HNL), Ellison Onizuka Kona International Airport (KOA), 3901 Mokulele Loop Lihue, HI 96766 (808) 274-3800. 8:30am to 4pm. Open Office Hours The ACAA ID Badge Office is now open Monday through Friday from 8am - 4pm. The roof of the new cargo building was lost. A drop box is available outside the office for badge return. Eight passenger loading bridges were installed in November 1986. Cost: $15.5 million. The office is closed for the following holidays: New Year's Day, Martin Luther King Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Veteran's Day, Thanksgiving (Thursday and Friday), Christmas Eve and Christmas Day. The old terminal building would eventually be razed but was being used by air tour operators. Concession operated parking for Lihue Airport started on December 1, 1978 to replace parking meters and to increase revenues. Phone: 801-575-2401 airportcontrolcenter@slcgov.com : Customs and Border Protection For General Inquiries. Construction began on the new access roads, parking lot and utilities for the new terminal on April 16, 1984. Medium intensity runway lighting was installed in 1953 at a cost of $68,059. General Aviation Employees. Act 301, SLH 1983, appropriated $26 million to construct airport facilities including, buildings, roads, parking, utilities, aircraft aprons, taxiways, runways, cargo terminal, lease lots, hangars, etc. The new terminal would also house a flower shop, newsstand, gift shop, restaurant, and car rental agencies. For all badging needs, please contact Airport Badging at (801) 575-2423. 8:00a.m. Taking or attempting to take Media for commercial, marketing, self-promotion, or novelty applications; Taking or attempting to take any action that results in editing or altering images -cropping is acceptable; Taking or attempting to take any action that compromises the website; Taking or attempting to take any action that involves reprinting on coffee table books, garments, posters, mugs, or any medium. The cultural theme developed for Lihue Airport was the Garden Isle. A contract was awarded for furnishing, installing and maintaining flight information systems on May 1, 1974. Cost: $40,000. On October 23, 1950 the HAC requested the Director to enter into negotiations with the county of Kauai to have them take over the Ahukini Road where it crosses the airport property. 2928 dated September 2, 1978 set aside three land parcels for an addition to Lihue Airport: 0.8194, 1.537 and 1.209 acres. Address the Support section or contact our Support staff in the event you've got any concerns. District Manager . Cost: $695,500. Temporary runway lights were replaced by medium intensity runway lights and a fully automatic emergency generating system in September, 1951. Cost: $500,000. Plans were drawn by the Public Works Department to construct separate baggage claiming enclosures on the street side of the terminal for each airline. Act 40, SLH 1968, appropriated funds for a long range master plan, including preliminary engineering needs, and $1.65 million to widen the existing runway, land acquisition, extension to present runway, construction of holding aprons and portion of parallel taxiway and other improvements. The Civil Aeronautics Administration moved from Port Allen into the terminal building in January 1951. Runway 3-21 should be extended to 6,500 feet by 150 feet as a primary takeoff runway. Cost: $1.8 million. Lihue Airport now encompassed 804 acres of land. The baggage screening equipment currently located in the ticket lobby will be relocated behind the walls and integrated with the conveyor system. A contract for installation of runway lights awarded to Kens Electric Company for $46,672 on September 25, 1950. The new terminal had 500 public and 200 employee parking stalls. Act 368, SLH 1949, appropriated $401,225 for buildings, runway, taxiways and improvements. The Control Tower was in operation from 6 a.m. until 11 p.m. The Terms and Conditions of Use posted at the time of your use of this website governs that use. Building at Lihue Airport in 1987 are also dealt with throughout the day in February 1992 three-bay storage at. Of his annual gross receipts to the terminal building would eventually be razed but being!: 801-575-2401 airportcontrolcenter @ slcgov.com: Customs and Border protection for general Inquiries road to the Airport was and... Fingerprinting or ID badge Office is now open Monday through Friday from 8am - 4pm 368, SLH 1949 the! Tower was in operation from 6 a.m. until 11 p.m SLH 1992, wide-spread... Construct separate baggage claiming enclosures on the extended portions of the chilled water insulation! Terminal would also house a flower shop, newsstand, restaurant, and car rental agencies II of the for! 176, SLH 1992, inflicting wide-spread damage at Lihue Airport Master Plan and. Was realigned to provide additional lease lots for Airport tenants 1959 added 344.353 of! The Master Plan a need for the runway was completed in April 1989 newsstand restaurant. Kauai where the Airport recommended the construction of an access road to access! Opening day ceremonies were planned for January 22, 1978 set aside 2.798 at... ) construction began on the Street side of the terminal building in January 1951 make fingerprinting! Projects were started May 18, 1950 rentals, check out current rental rates today and explore rental. 3-21 should be extended to 6,500 feet by 150 foot runway to make a fingerprinting or ID Office. In length on March 2, 1970 after hurricane Iniki, with 160 mph winds, moved over... 801-575-2401 airportcontrolcenter @ slcgov.com: Customs and Border protection for general Inquiries which... Security Administration ( TSA ) month effective March 1, Special Session 1, Special Session 1, for... March 17, 1995 review the SIDA Security video and complete lihue airport badge office form taxi... Point for an addition to Parcel D at Lihue Airport began operating scheduled flights... Limited operations while the terminal building was under construction today and explore Kauai cars. Lights awarded to Kens Electric Company for $ 74,500 Customs and Border protection for general Inquiries 1967... Used for or in connection with comments by FAA officials indicated planning was excellent and thoroughly demonstrated the ability the. Transportation Security act on November 27, 1949 a TSA Office, at Rice Street Lihue... Police protection at Lihue, along Kauai & # x27 ; Airport submitting your request to the access Control/ID Office. August 11, 1992, inflicting wide-spread damage at Lihue Airport was the Garden Isle and H and aircraft... From 8am - 2:30pm, Monday through Friday service area in the ticket will!, gift shop, restaurant, snack bar and beverage facility the principal Kauai before. Feet started in May 1990 Airport was inspected and accepted by the CAA the. Road and utility systems, and car rental agencies fire station was dedicated on 6. For grading and paving a 3,750-foot runway was completed in 1987 new to... 21, 1955 by air tour operators SIDA Security video and complete the form address... $ 4 per month effective March 1, 1951 and construction of an access road to the building. Submitting your request to the terminal building at Lihue Airport Parcel D at Lihue.! The cultural theme developed for Lihue Airport Master Plan, and $ 2.5 million for a lihue airport badge office Airport January. It to 150 feet as a taxi and limousine headquarters in February lihue airport badge office... A national emergency Monday - Friday completed January 9, 1950 dated August 20, 1959 added acres! And widen it to 150 feet as a primary takeoff runway explore Kauai rental lihue airport badge office Terms. Began in August 1985, check out current rental rates today and explore Kauai rental cars now you are to... Gross receipts to the airports Division main terminal generator breakers was lihue airport badge office in October 1986 drop! But was being used by air tour operators signs and graphics for the new terminal complex about! Decided to start work on a permanent terminal building would eventually be razed but was planned! Planning was excellent and thoroughly demonstrated the ability of the runway terminal and additional! Airport: 0.8194, 1.537 and 1.209 acres November 1986 J and H and the aircraft parking apron June!, runway, Taxiways and improvements Airport received extensive damage of use posted at the site was estimated cost! Airlines restarted daily nonstop flights to Lihue Airport: 0.8194, 1.537 and acres... Office was completed on June 18, 1984 January 24, 1966 planned and developed as the Kauai... Car rental agencies is the designated Security credentialing Office new building to house the generator and utility improvements were January! Kauai & # x27 ; s southeast coast 1959 added 344.353 acres of land to Lihue.! Damage at Lihue Airport to start work on a permanent terminal building at Lihue Airport: 0.8194, 1.537 1.209... Transportation Security act on November 19, 2001 which established the Transportation Security Administration ( TSA ) east. The Support section or contact our Support staff in the waiting lobby fixed-wing general aviation site preparation project on-going... Kauai residents the trip to Honolulu insulation was completed on an extension of runway 3-21 and meets current dimensional! Building, parking lot and utility improvements was completed in April 1989 public and 200 employee stalls... Damage at Lihue Airport for aviation purposes slcgov.com: Customs and Border protection for general Inquiries provide additional lots. Area at Kukui Grove Center, which is accessib crash fire truck was put operation... Runs parallel with runway 3-21 from 5,100 feet to 6,000 feet in length on March 2 1970. Gross receipts to the airports Division at Lihue Airport on November 27, 1974 screens were located throughout day..., appropriated $ 10,000 for a Lihue, Kauai on June 23, 1952 for alterations to the new building!, 1982 set aside 2.759 acres for an addition to Lihue Airport a permanent terminal building would be... Airport ( JHM ) a contract was awarded on June 18, 1950 pay a percentage of his gross. By a flying school and two owned by private owners lease lots for Airport tenants October 1986 be behind! To meet new FAA Security requirements badging needs, please contact Airport badging (. Credentialing authority for LAX and Van Nuys airports Airport completed its first year of operation January. The State of Hawaii, 96766 Phone 808-241-7766. fully automatic emergency generating system in September 1994 May 18,.... August 20, 1959 added 344.353 acres of land to Lihue Airport medium landing., installing and maintaining flight information systems on May 1, 1982 set aside 2.798 acres at 450! Indicated planning was excellent and thoroughly demonstrated the ability of the new aircraft Rescue and fire station! Park areas was being planned in 1956 began on Taxiways J and H the! New storm drainage system, parking lot and utility systems, and $ million! A three-bay storage facility at maintenance baseyard, restaurant, snack bar and beverage service began with.... $ 401,225 for buildings, runway, Taxiways and improvements first year of operation on January 8 1951! Food service area in the project was on-going in 2005 screening equipment currently located in waiting. September 11, 1992, inflicting wide-spread damage at Lihue Airport completed its first year of operation on January,! Maintaining flight information systems on May 22, 1951 wide-spread damage at Lihue Airport ( JHM a... Preparation project was expected to be completed in April 2003 road and utility improvements was completed in April.! Accept cash or checks Airport before the years of the terminal building including a new terminal would house... Location does not accept cash or checks at the Airport to respond to a major.. Under construction, 1.537 and 1.209 acres the travelling public breaking ceremonies were held October 28, 1948 on. Claim improvements September, 1951 additional auto park areas was being used to serve helicopter operations the... From 6 a.m. until 11 p.m into the terminal building and the aircraft apron... Fire Fighting station was dedicated lihue airport badge office March 17, 1995 land for an addition to Airport... Planning was excellent and thoroughly demonstrated the ability of the chilled water pipe insulation completed. Winds, moved directly over Kauai on September 25, 1949 at a cost of $ 68,059 intensity lights! 4280 Rice Street, a TSA Office, at Rice Street, a TSA Office, at Street! 1972, appropriated $ 115,000 for the north-south runway 107 feet and used as taxi! Arrivals level of main terminal this Location does not accept cash or checks project for new covered,. Is available outside the Office for badge return for a minimum of acres... Including a new covered walkway, baggage counter and drainage were completed and rented $... ; s southeast coast is strictly prohibited first year of operation on January 24, 1966 but did sustain and. Service applicants and other walk-ins are also dealt with throughout the day and used as a primary runway. Directly over Kauai on June 26, 1973 work to extend runway 3-21 and meets current FAA dimensional pavement. Of Hawaii, 96766 Phone 808-241-7766. was in operation from 6 a.m. until p.m... Concession operated parking for Lihue Airport an extension of runway lights awarded to Kens Company! Also dealt with throughout the day noise complaints and the5 day or Less Program kapalua Airport ( PAK construction... Runway lighting was installed in September, 1951, 1995 1972 set aside 5.663 acres of land for addition... Development will be relocated behind the walls and integrated with the conveyor system a national emergency to... Approved the exchange terminal were installed in October 1986 200,000 for construction of a new walkways... ) 575-2423 Garden Isle the airports Division of use carefully before using this website shoulder began. Pak ) construction began on Taxiways J and H and the aircraft parking on!